9th Anniversary, Brantas Energi Held Virtual Fame Up to Free Webinar

16 December 2020


Jakarta, 16 December 2020 - Celebrating its 9th anniversary, PT Brantas Energi, which is a subsidiary of PT Brantas Abipraya (Persero), held a quite interesting event, a little different from previous years. Considering the situation and conditions that are still in the pandemic era of the corona virus disease-19 (Covid-19), Brantas Energi held a virtual celebration and free webinar with the theme "Building Optimistic Energy Towards Success in the World-Hereafter" (15/12).

"With this 9th year, I hope that Brantas Energi can continue to work, continue the spirit of supporting the Government's electricity program, which reaches 35,000 megawatts. We also express our deepest gratitude to the employees, for their hard work in building Brantas Energi to date, ”said Sutjipto as President Director of PT Brantas Energi.

He added that Brantas Energi, which was born on December 12, 2011, also gave the highest appreciation by giving awards to three of its best employees as long as the company that invests in renewable energy, especially Hydro Power, was established at the anniversary event.

Adding to the excitement of its 9th anniversary, after holding a ceremony this morning, Brantas Energi also held a webinar for its employees and Brantas Abipraya employees. By presenting great speakers from the ESQ Leadership Center, this webinar was successfully held.

"Hopefully this activity can raise the spirit of Brantas Energi to remain productive, achieving even though Indonesia and Global are currently being hit by a pandemic, we all still have to be optimistic to continue to progress, develop and transform for superior work and performance," said Sutjipto.

As additional information Brantas Energi has successfully operated the Padang Guci Minihydro Power Plant (PLTM) in Bungin Tambun III Village with a power of 3 x 2.0 Megawatts (MW), PLTM Sako 1 which is located in Pesisir Selatan Regency, West Sumatra (West Sumatra) with produces 2x3 MW of power which will be able to power 12 thousand houses with an installed power of 450 watts.

Not only hydropower, Brantas Energi is also exploring Solar Power Plants (PLTS) by building PLTS Gorontalo of 2.0 MWp and does not rule out the possibility to expand into other types of New and Renewable Energy (EBT) businesses.